Takt & Staffing

Production assumptions

Line-balance model
units
hours
Default: 1 shift per day — adjust if needed
min
min
%
lines
Efficiency adjusts productive output for normal operating losses. Planned breaks and downtime are deducted separately.
Balanced
480 units per day
Required takt
—
seconds per unit
Required staffing
—
productive people
Current capacity
—
units per period
Gap to demand
—
units per period

Line balance

Step load compared with takt; staffing is applied within each process step.

Bottleneck—
Line balance—
Labor content—
Constraint capacity—
Process stepEffective cycleAssignedTakt load

Staffing sensitivity

Expected output with 5% and 10% more or less staffing, using the same schedule and efficiency.