Takt & Staffing

Production assumptions

Line-balance model
units
hours
Default: 1 shift per day — adjust if needed
min
min
%
lines
Efficiency adjusts productive output for normal operating losses. Planned breaks and downtime are deducted separately.
Balanced
480 units per day
Required takt
seconds per unit
Required staffing
productive people
Current capacity
units per period
Gap to demand
units per period

Line balance

Step load compared with takt; staffing is applied within each process step.

Bottleneck
Line balance
Labor content
Constraint capacity
Process stepEffective cycleAssignedTakt load

Staffing sensitivity

Expected output with 5% and 10% more or less staffing, using the same schedule and efficiency.